<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Residence Life Renovation Blog</title>
	<atom:link href="http://reslife.truman.edu/blog/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://reslife.truman.edu/blog</link>
	<description></description>
	<lastBuildDate>Sat, 17 Oct 2009 01:51:44 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.5</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Students Break, Construction Continues</title>
		<link>http://reslife.truman.edu/blog/?p=30</link>
		<comments>http://reslife.truman.edu/blog/?p=30#comments</comments>
		<pubDate>Sat, 17 Oct 2009 01:51:44 +0000</pubDate>
		<dc:creator>lizraine</dc:creator>
				<category><![CDATA[Ryle Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=30</guid>
		<description><![CDATA[
Most students left for Midterm Break Wednesday, but that didn&#8217;t slow the progress of construction.  As they come back to Ryle Hall Sunday 10/18, they will see noticeable changes on the outside! (Picture taken 10-15-09)

Ryle Hall gets a new hat, just in time for winter!  A new roof is being installed on Ryle, and new [...]]]></description>
			<content:encoded><![CDATA[<p><img class="alignnone size-medium wp-image-38" title="Lots of Activity 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/Lots-of-Activity-10-15-095-225x300.jpg" alt="Lots of Activity 10-15-09" width="225" height="300" /></p>
<p>Most students left for Midterm Break Wednesday, but that didn&#8217;t slow the progress of construction.  As they come back to Ryle Hall Sunday 10/18, they will see noticeable changes on the outside! (Picture taken 10-15-09)</p>
<p><img class="alignnone size-medium wp-image-39" title="New Roof 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/New-Roof-10-15-09-300x225.jpg" alt="New Roof 10-15-09" width="300" height="225" /></p>
<p>Ryle Hall gets a new hat, just in time for winter!  A new roof is being installed on Ryle, and new vents are being created for mechanical processes.  (Picture taken on 10-15-09)</p>
<p><img class="alignnone size-medium wp-image-40" title="New Windows Installation - Doson Side 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/New-Windows-Installation-Doson-Side-10-15-09-225x300.jpg" alt="New Windows Installation - Doson Side 10-15-09" width="225" height="300" /></p>
<p>A construction worker works to install new windows in each of the rooms in Ryle.  This will surely help regulate the building&#8217;s temperature year-round!  (Picture taken 10-15-09)</p>
<p><img class="alignnone size-medium wp-image-41" title="Framing for new HVAC System 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/Framing-for-new-HVAC-System-10-15-09-300x225.jpg" alt="Framing for new HVAC System 10-15-09" width="300" height="225" /></p>
<p>A newly installed window with new support structure for the HVAC system. (Picture taken 10-15-09)</p>
<p><img class="alignnone size-medium wp-image-42" title="New Bathroom Windows 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/New-Bathroom-Windows-10-15-09-225x300.jpg" alt="New Bathroom Windows 10-15-09" width="225" height="300" /></p>
<p>Ryle got brand new bathroom windows too!!!! (Picture taken 10-15-09)</p>
<p><img class="alignnone size-medium wp-image-44" title="5th Floor Crossover New Rooms 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/5th-Floor-Crossover-New-Rooms-10-15-09-225x300.jpg" alt="5th Floor Crossover New Rooms 10-15-09" width="225" height="300" /></p>
<p>Campbell-Grim-Ryle Hall Director Liz Raine looks out from the door frame of one of the new double rooms on the 5th floor crossover.  (Picture taken 10-15-09)</p>
<p><img class="alignnone size-medium wp-image-45" title="Man on North Bacony and Being Bricked 10-15-09" src="http://reslife.truman.edu/blog/wp-content/uploads/2009/10/Man-on-North-Bacony-and-Being-Bricked-10-15-09-225x300.jpg" alt="Man on North Bacony and Being Bricked 10-15-09" width="225" height="300" /></p>
<p>The north balcony/private dining room got its roof on Thursday 10/15 and has begun the process of getting bricked.  You can see a worker smoothing out the cement between the cracks on the top of the roof.  This will provide a new vantage point to Ryle and the upper balcony will be a great place to get outside and study on nice days! (Picture taken 10-15-09)</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=30</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>September Demolition</title>
		<link>http://reslife.truman.edu/blog/?p=29</link>
		<comments>http://reslife.truman.edu/blog/?p=29#comments</comments>
		<pubDate>Tue, 06 Oct 2009 15:31:18 +0000</pubDate>
		<dc:creator>lizraine</dc:creator>
				<category><![CDATA[Ryle Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=29</guid>
		<description><![CDATA[
Once the exterior and interior walls were removed the fourth floor apartment (old rooms 416 and 418), you can see where the new corner lounges, study rooms, and kitchens will be on each floor.&#160; You can also see the ductwork has been installed for the new HVAC system. (Picture taken September 4, 2009)
&#160;

With the ceiling [...]]]></description>
			<content:encoded><![CDATA[<p><img height="667" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Walls Taken Down for New Lounge, Kitchen, Study Rooms 09-04-09.JPG" alt="" /></p>
<p>Once the exterior and interior walls were removed the fourth floor apartment (old rooms 416 and 418), you can see where the new corner lounges, study rooms, and kitchens will be on each floor.&nbsp; You can also see the ductwork has been installed for the new HVAC system. (Picture taken September 4, 2009)</p>
<p>&nbsp;</p>
<p><img height="667" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Shower Fixtures Removed - A View from Above 09-04-09.JPG" alt="" /></p>
<p>With the ceiling removed from room 431&#8217;s bathroom, you can see that all of the fixtures in the bathroom have been removed. (Picture taken September 4, 2009)</p>
<p>&nbsp;</p>
<p><img height="667" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Old 4th floor Lounge and 432-438 Cleared 09-04-09.JPG" alt="" /></p>
<p>All of the walls were removed from the fourth floor bridge to reveal a nice large open space.&nbsp; On the right side of this picture (to the right of the column with the blue paint at the bottom) was the old fourth floor lounge.&nbsp; On the left side of this picture (to the left of the same column) were rooms 432, 434, 436, and 438.&nbsp; This new space will be double rooms that will share a community bathroom.&nbsp; (Picture taken September 4, 2009)</p>
<input height="667" width="500" type="image" src="http://reslife.truman.edu/blog/wp-content/uploads/image/New Bridge Double Room from Old Lounge 09-04-09.JPG" />
<p>Where the fourth floor lounge once stood, there will be new double rooms created.&nbsp; This viewpoint shows the approximate size of one of the new double rooms from just outside of where the doorway will be put in.&nbsp; (Picture taken September 4, 2009).</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=29</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ryle Hall gets its wings</title>
		<link>http://reslife.truman.edu/blog/?p=28</link>
		<comments>http://reslife.truman.edu/blog/?p=28#comments</comments>
		<pubDate>Wed, 09 Sep 2009 18:18:56 +0000</pubDate>
		<dc:creator>lizraine</dc:creator>
				<category><![CDATA[Ryle Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=28</guid>
		<description><![CDATA[
The foundation has been poured on both the north and south ends of the Ryle Main Lounge and Cafeteria.&#160; These new areas will create additional space for the Ryle Cafeteria and will showcase balconies off of each side of the Main Lounge.
]]></description>
			<content:encoded><![CDATA[<p><img height="667" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/IMG_4260(1).jpg" alt="" /></p>
<p>The foundation has been poured on both the north and south ends of the Ryle Main Lounge and Cafeteria.&nbsp; These new areas will create additional space for the Ryle Cafeteria and will showcase balconies off of each side of the Main Lounge.</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=28</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Welcome to the Ryle Renovation Blog</title>
		<link>http://reslife.truman.edu/blog/?p=26</link>
		<comments>http://reslife.truman.edu/blog/?p=26#comments</comments>
		<pubDate>Thu, 27 Aug 2009 18:13:38 +0000</pubDate>
		<dc:creator>jgardner</dc:creator>
				<category><![CDATA[Ryle Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=26</guid>
		<description><![CDATA[Hello and Welcome to the Ryle Renovation Blog!
On this Blog we will provide updates throughout the Ryle Renovation of demolition, new additions, and any other happenings related to the Ryle Hall Renovations.&#160; Feel free to post your own thoughts on the changes going on.&#160; We love to hear from past, present, and future Ryle residents.&#160;
The [...]]]></description>
			<content:encoded><![CDATA[<p><strong><span class="Title"><strong><font color="#3366ff" size="5">Hello and Welcome to the Ryle Renovation Blog!</font></strong></span></strong></p>
<p><font size="3">On this Blog we will provide updates throughout the Ryle Renovation of demolition, new additions, and any other happenings related to the Ryle Hall Renovations.&nbsp; Feel free to post your own thoughts on the changes going on.&nbsp; We love to hear from past, present, and future Ryle residents.</font>&nbsp;</p>
<p><font face="Comic Sans MS" color="#800080" size="3">The Office of Residence Life</font></p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=26</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>DOB is almost DONE.</title>
		<link>http://reslife.truman.edu/blog/?p=25</link>
		<comments>http://reslife.truman.edu/blog/?p=25#comments</comments>
		<pubDate>Mon, 29 Jun 2009 19:17:58 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Dobson Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=25</guid>
		<description><![CDATA[After walking through Dobson last week, it is obvious that the Hall is close to completion.&#160; Construction crews are putting the final touches on the building, systems are being tested, and new furniture is being moved into the building.&#160; Looking back at some of the photos from the first post, it is amazing to see [...]]]></description>
			<content:encoded><![CDATA[<p>After walking through Dobson last week, it is obvious that the Hall is close to completion.&nbsp; Construction crews are putting the final touches on the building, systems are being tested, and new furniture is being moved into the building.&nbsp; Looking back at some of the photos from the first post, it is amazing to see how far things have developed.&nbsp;</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Double with Furniture 6-24-09.JPG" alt="" /></p>
<p>Dobson double with furniture.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Double with Furniture2 6-24-09.JPG" alt="" /></p>
<p>Dobson Double with furniture.&nbsp; Each resident gets: chair, desk, shelf, personal drawer, wardrobe,&nbsp;and lofted bed.&nbsp; Roommates will share a chest of drawers (3 or 4 drawers).</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Double with Furniture3 6-24-09.JPG" alt="" /></p>
<p>Dobson double facing the door.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Triple with Furniture 6-24-09.JPG" alt="" /></p>
<p>Dobson triple with furniture.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Triple with Furiture2 6-24-09.JPG" alt="" /></p>
<p>Dobson triple with furniture.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Lounge with Furniture 6-24-09.JPG" alt="" /></p>
<p>The new furniture for the lounges has already arrived and stared to be placed in the floor lounges.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Lounge with Furniture2 6-24-09.JPG" alt="" /></p>
<p>There will be a mix of rolling work chairs and sofa chairs for residents to use in the lounges to either study at the tables or watch a movie on the flat panel TV.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Kitchin Finished 6-24-09.JPG" alt="" /></p>
<p>A look into a completed kitchen that is attached to the lounge by a double door.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Kitchin Finished2 6-24-09.JPG" alt="" /></p>
<p>Kitchens will be complete with full-size fridge/freezer, ice machine, range top, oven, and sink.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson Study Room 6-24-09.JPG" alt="" /></p>
<p>Here is a Study Room with its chairs just waiting for a table and some hard working residents.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Main Lounge 6-24-09.JPG" alt="" /></p>
<p>Here we are looking into the Main Lounge if you were walking in the main entrance.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Main Lounge2 6-24-09.JPG" alt="" /></p>
<p>Now looking the other way in the Main Lounge, towards the Hall Desk and main entrance.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Hall Desk 6-24-09.JPG" alt="" /></p>
<p>Here is a look at the Hall Desk and the new entrance (glass doors) that leads to the back of Dobson Hall. The red door leads to the 1 South hallway and rooms in the 1200 and 1300 wings.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Laundry Room 6-24-09.JPG" alt="" /></p>
<p>Here is a look at the laundry room.&nbsp; You can see where all the water hookups are for the washers, the dryers will be located behind the photographer.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/C-Store Fridges 6-24-09.JPG" alt="" /></p>
<p>Here is a look into the C-Store and where the fridges will be located.</p>
<p><img width="500" height="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Multipurpose Room 6-24-09.JPG" alt="" /></p>
<p>This is the Dobson Multi-Purpose Room.&nbsp; It will be a great place within Dobson for meetings, programs, and other events.&nbsp; Any organization or group will be able to reserve it through the Student Union Building&rsquo;s Virtual EMS reservation system.</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=25</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Carpet and Counter Tops</title>
		<link>http://reslife.truman.edu/blog/?p=24</link>
		<comments>http://reslife.truman.edu/blog/?p=24#comments</comments>
		<pubDate>Mon, 01 Jun 2009 16:11:45 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Dobson Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=24</guid>
		<description><![CDATA[After a busy end of the year, we finally got a chance to walk through Dobson Hall again and see all the progress that has been over the past two months.&#160; There a lot of &#34;final touches&#34; being completed on the 2nd, 3rd, and 4th floors including the installation of ceiling tiles, paint, carpeting, and [...]]]></description>
			<content:encoded><![CDATA[<p>After a busy end of the year, we finally got a chance to walk through Dobson Hall again and see all the progress that has been over the past two months.&nbsp; There a lot of &quot;final touches&quot; being completed on the 2nd, 3rd, and 4th floors including the installation of ceiling tiles, paint, carpeting, and even furniture has started to move back into Dobson.&nbsp; There has been a lot of progress, so please stay tuned as the project nears completion.</p>
<p>For those of you who are looking at the Dobson Blog for the first time because you have just recently been placed in Dobson Hall as an incoming freshman, take time to look back at some of the previous posts and see the great changes that are being made to your new home.&nbsp; When you come to visit at Summer Orientation we&#8217;ll have a Staff Member there who will have more pictures and plans, will try to help explain what Dobson will look like on move-in day, and will help answer any questions you might have.&nbsp; So take some time to see what your new home is going to look like!</p>
<p><img height="500" alt="" width="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/2nd Floor Ceiling Tile Instalation 5-18.JPG" /></p>
<p>The installation of the 2nd floor&#8217;s ceiling, along with a new fire system, lighting, and the blue paint on the door frames will serve as an accent color for this floor.</p>
<p><img height="500" alt="" width="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd Floor Carpet 5-18 Instalation.JPG" /></p>
<p>A construction worker is hard at work installing the new carpet on 3rd Floor.&nbsp; The dark carpet will be the base carpet for all the hallways and resident rooms in Dobson.&nbsp; The green carpet is the accent color for the 3rd Floor.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd Floor Computer Station 5-18.JPG" /></p>
<p>The 3 North computer station now has its counter top installed.&nbsp; Each floor will have 4 computers, 2 by each lounge, for resident use.&nbsp; These computers will be networked to a printer at the Hall Desk where you can collect your printed materials.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd Floor Kitchen Installation 5-18.JPG" /></p>
<p>The 3 North Kitchen with its countertop, cabinets, and floor tile all installed.&nbsp; There will be a kitchen on every floor with a fridge, stove top, oven and sink for public use.&nbsp; These double doors lead right into the 3 North Lounge.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd Floor Lounge Carpeted 5-18.JPG" /></p>
<p>Here is the 3 North Lounge with the green accent carpet already installed.&nbsp; The wall this picture is facing will have a flat panel TV mounted onto it.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/4th Floor Room with Furniture 5-18.JPG" /></p>
<p>A 4th Floor room already has all of its furniture placed in it, but not assembled yet.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/4th Floor Room with Closets 5-18.JPG" /></p>
<p>Here is a 4th floor room with just the&nbsp;wardobes installed.&nbsp; All the furniture in Dobson is&nbsp;freestanding, so you can arrange your room any way you want to.</p>
<p><img height="500" alt="" width="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/4th Floor Room with Towel Rack 5-18.JPG" /></p>
<p>Here is the door wall of a Dobson room, complete with brand new towel racks!</p>
<p><img height="500" alt="" width="375" src="http://reslife.truman.edu/blog/wp-content/uploads/image/4th Floor Room with Temperature Control 5-18.JPG" /></p>
<p>Here is a cooling unit used for Dobson rooms, complete with a thermostat to allow you to set the temperature in your room.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Main Lounge Stone Work 5-18.JPG" /></p>
<p>Here is the new stone work that has been installed in the Main Lounge. There will be a Flat Panel TV installed on this wall as well as a gas fire place.</p>
<p><img height="375" alt="" width="500" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Main Lounge with Mailboxes 5-18.JPG" /></p>
<p>Once again you see where the fireplace and TV will be, and in the distance where resident mailboxes will be located.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=24</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Mechanical Work Moves Along</title>
		<link>http://reslife.truman.edu/blog/?p=23</link>
		<comments>http://reslife.truman.edu/blog/?p=23#comments</comments>
		<pubDate>Mon, 30 Mar 2009 20:50:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Dobson Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=23</guid>
		<description><![CDATA[Another walk around an under construction Dobson Hall shows that the mechanical work appears to be moving swiftly along.&#160; Almost all the piping and HVAC has been laid or hung, and they are now installing the units that will allow every resident to control the temperature of their own room.&#160; The work on the administrative [...]]]></description>
			<content:encoded><![CDATA[<p>Another walk around an under construction Dobson Hall shows that the mechanical work appears to be moving swiftly along.&nbsp; Almost all the piping and HVAC has been laid or hung, and they are now installing the units that will allow every resident to control the temperature of their own room.&nbsp; The work on the administrative wing (where the offices and multipurpose room will be located) moves swiftly along with the removal of old mechanical machines.&nbsp; The new mechanical room (located where the old computer lab and pool table used to be) is full of brand new machines and pipes to ensure the safety and comfort of the entire building and the residents.&nbsp; Here are some pictures from our latest visit and at the bottom you will notice a lot of new 3-D images.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd floor Kitchen 3-23-09.JPG" /></p>
<p>Third Floor South Lounge looking into the kitchen.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd Floor Lounge TV 3-23-09.JPG" /></p>
<p>Third Floor South Lounge facing the wall that will have the TV.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Fireplace 3-23-09.JPG" /></p>
<p>The Main Lounge&#8217;s fireplace has now been installed.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Laundry Room 3-23-09.JPG" /></p>
<p>The Laundry Room room that will be located in the Northeast corner of the First Floor.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Offices 3-23-09.JPG" /></p>
<p>The Student Advisor, Hall Director and Community Coordinator Offices in the Administrative Wing.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Mechanical Room 3-23-09.JPG" /></p>
<p>In the Mechanical Room there will be a lot of pipework to opperate the cooling system.</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Electirial Work 3-23-09.JPG" /></p>
<p>The new electrical system installed to keep the lights on.</p>
<p>&nbsp;</p>
<hr width="100%" size="2" />
<p>Below are some more 3-D renderings of a renovated Dobson.</p>
<p>&nbsp;</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/mlounge2.png" /></p>
<p>Dobson Main Lounge: from the main entrance</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/mlounge3.png" /></p>
<p>Dobson Main Lounge: from the hall desk</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/mlounge4.png" /></p>
<p>Dobson Main Lounge: from the mailboxes</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/mlounge6.png" /></p>
<p>Dobson Main Lounge: from the elevator looking at the hall desk and main entrance</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/lounge1.png" /></p>
<p>Dobson Floor Lounge with kitchen: standing at the entrance</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/lounge4.png" /></p>
<p>Dobson Floor Lounge with kitchen: facing the TV</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/lounge5.png" /></p>
<p>Dobson Floor Lounge with kitchen: facing the entrance</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/lounge3.png" /></p>
<p>Dobson Floor Lounge with kitchen: kitchen</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/lounge_study2.png" /></p>
<p>Dobson Floor Lounge with study lounge: facing the study lounge</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/lounge_study.png" /></p>
<p>Dobson Floor Lounge with study lounge: in the study lounge</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson_triple0.png" /></p>
<p>Dobson Triple: Overhead View</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson_triple1.png" /></p>
<p>Dobson Triple: Floor Level View</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=23</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Painting Begins</title>
		<link>http://reslife.truman.edu/blog/?p=22</link>
		<comments>http://reslife.truman.edu/blog/?p=22#comments</comments>
		<pubDate>Thu, 19 Feb 2009 17:59:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Dobson Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=22</guid>
		<description><![CDATA[Our latest walk through Dobson Hall has allowed us to view what colors will be accenting the hallways.&#160; There has also been a tremendous amount of work on the first floor in the location of the main entryway, main lounge, convenience store, laundry room, hall offices, and the multipurpose room.&#160; Also since the last post, [...]]]></description>
			<content:encoded><![CDATA[<p>Our latest walk through Dobson Hall has allowed us to view what colors will be accenting the hallways.&nbsp; There has also been a tremendous amount of work on the first floor in the location of the main entryway, main lounge, convenience store, laundry room, hall offices, and the multipurpose room.&nbsp; Also since the last post, the 2009-2010 Dobson Hall Staff was named, consisting of twelve excited Student Advisors and a Community Coordinator.&nbsp; Now all that is left is the completion of the building&#8230;</p>
<p>The <a href="http://reslife.truman.edu/halls/Maps/maps.asp">Truman State University Residence Life Website</a> has an updated building map of Dobson Hall after renovation, feel free to check it out!</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/4th Floor Study with New CC Claire Hof 2-18.JPG" /></p>
<p>2009-2010 Dobson Hall Community Coordinator Claire Hof looks through the 4 South Study Lounge windows.&nbsp; Be sure to notice the purple accent colors that will be on the 4th Floor.</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/3rd Floor SW Stairwell Entrance 2-18.JPG" /></p>
<p>The 3rd Floor will have a green accent color.</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/2nd Floor SW Stairwell Entrance 2-18.JPG" /></p>
<p>The 2nd Floor will have a Blue Accent color.&nbsp; (Not shown: the 1st Floor accent will be red)</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Main Lounge looking at Mailboxes on far wall 2-18.JPG" /></p>
<p>This is the Main Lounge, as if you were standing at the Hall Desk.&nbsp; Along the right hand side will be a fireplace and TV.&nbsp; In the background you can see where the mailboxes will be located.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Closeup of Mailboxes 2-18.JPG" /></p>
<p>Here is a close up of the mailboxes, which will be located in the Main Lounge across from the Convenience Store.</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=22</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Building New Walls&#8230;</title>
		<link>http://reslife.truman.edu/blog/?p=21</link>
		<comments>http://reslife.truman.edu/blog/?p=21#comments</comments>
		<pubDate>Tue, 03 Feb 2009 17:27:30 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Dobson Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=21</guid>
		<description><![CDATA[Welcome to a new year in the Dobson Renovation.&#160; 2009 brought more developments in the renovation project.&#160; Drywall is starting to be installed.&#160; Workers are also starting to install new plumbing parts including some of the drinking fountains.&#160; The new electrical boxes have been installed in the past month, and it looks like the building [...]]]></description>
			<content:encoded><![CDATA[<p>Welcome to a new year in the Dobson Renovation.&nbsp; 2009 brought more developments in the renovation project.&nbsp; Drywall is starting to be installed.&nbsp; Workers are also starting to install new plumbing parts including some of the drinking fountains.&nbsp; The new electrical boxes have been installed in the past month, and it looks like the building is coming along smoothly.&nbsp;</p>
<p>When Dobson opens in the fall, the communities will be split into upperclassmen and first year communitiies.&nbsp; So when reading the blog, keep in mind that floors 1 and 3 will be for upperclassmen and floors 2 and 4 for first years.&nbsp; At the bottom of this entry you will see some 3-D designs of what a double room in Dobson will look like in August.&nbsp; If you have any questions, comments, or requests, please feel free to comment on the blog!</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Door Frames 1-26-09.JPG" /></p>
<p>Looking down the hallways towards the lounge with new doorframes and drywall installed.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/2nd Double Room 1-26-09.JPG" /></p>
<p>Double room with the drywall around the HVAC installed.&nbsp; Just waiting for paint and carpet.</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Drinking Fountain 1-26-09.JPG" /></p>
<p>New handicap acessable drinking fountain located between the lounge and kitchen.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Fridge 1-26-09.JPG" /></p>
<p>Looking through the doorway into the new fridge of the C-Store that will be located just off the Main Lounge.</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Main Entryway 1-26-09.JPG" /></p>
<p>The main entryway into Dobson.</p>
<p>&nbsp;</p>
<hr width="100%" size="2" />
<p>Below are a couple 3-D images of a double room in Dobson.&nbsp; Expect a few more 3-D images in coming weeks of the new lounges and entryway will look like.</p>
<p>&nbsp;</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson_double1.jpg" /></p>
<p>Overhead view (includes desk, chair, warddrobe, and lofted bed which can be de-lofted)</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson_double2.jpg" /></p>
<p>View from doorway towards window.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dobson_double3.jpg" /></p>
<p>View from window towards the door.</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=21</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Framing it up&#8230;</title>
		<link>http://reslife.truman.edu/blog/?p=20</link>
		<comments>http://reslife.truman.edu/blog/?p=20#comments</comments>
		<pubDate>Fri, 19 Dec 2008 16:39:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Dobson Renovations]]></category>

		<guid isPermaLink="false">http://reslife.truman.edu/blog/?p=20</guid>
		<description><![CDATA[With the first semester over and residents moved out, it was time to check in on the progress in Dobson and the changes since our last visit.&#160; Almost all the windows have been installed, the new heating and cooling vents are progressing along well, they are just starting to install drywall in some areas, and [...]]]></description>
			<content:encoded><![CDATA[<p>With the first semester over and residents moved out, it was time to check in on the progress in Dobson and the changes since our last visit.&nbsp; Almost all the windows have been installed, the new heating and cooling vents are progressing along well, they are just starting to install drywall in some areas, and the framing for new or adjusted rooms are squared up.&nbsp; Things are really starting to come together, and it appears the building has officially turned from having old things removed to having new items installed.&nbsp; Stay tuned for more excitement in 2009!</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Corner rooms on 2nd Floor 12-16-08.JPG" /></p>
<p>Framing of corner rooms overlooking the courtyard in 2-South.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Quiet Study Lounge 12-16-08.JPG" /></p>
<p>Windows looking into what will be a Study Lounge.&nbsp; 3 out of 4 floors will have a Study Lounge.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Kitchen 12-16-08.JPG" /></p>
<p>Looking into the double doors of what will be a kitchen.&nbsp; Every floor will have their own kitchen.</p>
<p><img width="500" height="375" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Dry-Wall on duct work in double 12-16-08.JPG" /></p>
<p>Above the window, you will notice brand new dry wall covering the HVAC running through every room.</p>
<p><img width="375" height="500" alt="" src="http://reslife.truman.edu/blog/wp-content/uploads/image/Multipurpose Room 12-16-08.JPG" /></p>
<p>Although it is being used as storage during construction, this will be a brand new multipurpose room.</p>
]]></content:encoded>
			<wfw:commentRss>http://reslife.truman.edu/blog/?feed=rss2&amp;p=20</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
